How the project moves forward

Bespoke furniture fitting and installation in Málaga

We can assist you inEspañolEnglishDeutschРусский

A cabinet is not finished when it leaves the workshop. The fitting team still has to protect the room, make safe fixings and set the moving parts against the actual walls.

Project process

Fitting that can be checked at handover

Delivery is planned around the building entrance and the order in which units must be assembled. On site, we test the result with you rather than judging it from closed doors.

01

Room protected

We agree which floors and access routes need covering before carrying in the panels.

02

Units set level

Cabinets are positioned against the floor and wall lines measured for the project.

03

Fixings suited to the wall

The support and expected load determine how a unit is secured.

04

Openings tested

Doors, drawers and fitted lights are checked before the joint review.

Before choosing

Questions about bespoke furniture fitting and installation

How is the fitting date set?+

We confirm it against production and the condition of the room. Work that affects the walls, floor or services should be finished first.

What if a trim needs adjustment?+

Small fitting allowances are part of the agreed plan. Any additional work outside the quote is explained and priced before it is carried out.

Your project starts here

Send the details you have

We will review your enquiry and contact you to clarify the scope and next steps. Sending this form does not place an order.

  1. 01 Initial reply and feasibility review
  2. 02 Suggested next step
  3. 03 A detailed quotation antes de fabricar
Ask on WhatsApp

No obligation. Approximate measurements are enough for an initial conversation.